McDermott to supply jackets for Bul-Hanine expansion offshore Qatar

Offshore staff

HOUSTON – Qatar Petroleum has contracted McDermott International (NYSE:MDR) to engineer, procure, construct, and install four wellhead jackets for a brownfield development on the Bul-Hanine field offshore and to the east of Doha.

Two of the structures are due to be installed by December 2016, with the other two to follow in July 2017.

Combined weight of all four is 3,495 tons (3,170 metric tons).

10/08/2015

 

Share your news with Offshore at news@offshore-mag.com

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...