KBR in Singapore to manage North Sea Culzean topsides engineering

Offshore staff

HOUSTON SMOE Singapore has commissioned KBR (NYSE: KBR) to perform detailed design engineering for three sets of platform topsides for Maersk Oil’s Culzean project in the UK central North Sea.

These are for the living quarters, central processing facility, and wellhead decks.

Since May 2014, KBR has supported Maersk in the development of the concept and front-end engineering and design for the ultra-high-pressure/high-temperature Culzean field from its office in Leatherhead near London.

The Leatherhead team will transition the 16-month detailed design to KBR’s project team in Singapore. In addition, KBR will provide follow-on services to SMOE during the 32-month duration of the project.

Contracts have already been placed for 18 major equipment packages. Early engagement of the supply chain in the project life-cycle is critical in achieving first gas from Culzean for 2019, KBR said.

10/29/2015

 

Share your news with Offshore at news@offshore-mag.com

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...