Erin Energy gets more time for offshore Kenya exploration

Offshore staff

HOUSTON Erin Energy Corp. has received an 18-month extension of the initial exploration period (IEP) for blocks L27 and L28 offshore Kenya.

The extension of the IEP for the production-sharing contracts is effective as of Aug. 9, 2015. It has been extended to February 2017. The required work remaining includes the acquisition, processing, and interpretation of 3D seismic data on both blocks.

Erin Energy is the operator and has a 100% interest in both offshore blocks.

09/10/2015

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...