Peak launches FlexiDrift adjustable downhole tool

Offshore staff

PERTH, Australia – Peak Well Systems has launched FlexiDrift, an adjustable tool to confirm the minimum diameter specification of wellbore tubing over a range of tubing sizes.

FlexiDrift has three standard tool sizes that can be accurately adjusted to within 10,000th of the desired diameter to span drift diameters of 2.00-2.75 in., 2.72-3.75 in., and 3.70-5.75 in. respectively; thereby reducing the inventory required to run standard toolstring operations.

The FlexiDrift consists of a mandrel with two sets of extendable rails that can be manually operated using the adjustment sleeves to the desired radius of the well tubing. When run downhole, Peak said the positioning of the extended rails provides radial contact across the widest operating range of required drift sizes ensuring no unforeseen obstructions, debris, or damage is present in the well prior to other operations.

FlexiDrift’s design allows sufficient bypass of fluid for efficient toolstring conveyance in well fluids. It can be adjusted and deployed via slickline and all other standard industry conveyance methods without the need for specialist training, said Peak.

A shear release function triggered through upwards jarring allows the FlexiDrift to retract to its minimum ID to enable reliable retrieval to surface, even in highly deviated wells or those with high levels of scale and debris.

07/30/2015

Peak Well Systems’ FlexiDrift downhole tool
Cutaway version of Peak Well Systems’ FlexiDrift downhole tool. (Courtesy Peak Well Systems)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...