ONGC orders new platforms for Bassein life extension offshore India

Offshore staff

MUMBAI, IndiaONGC has commissioned L&T Hydrocarbon Engineering Ltd. to build new facilities for the Bassein field development offshore western India.

Scope of the engineering, procurement, construction, and installation contract includes a new platform providing gas processing and compression; a nine-slot wellhead platform; a new living quarter platform; topsides modifications on existing platforms; and associated subsea pipelines.

All work is due to be completed by the end of 2016.

ONGC needs the facilities to extend the field life and increase recovery of the Bassein field. It is targeting cumulative production through 2027-2028 of 19.56 bcm of gas, 1.97 MMcm of condensate, and 1.83 million metric tons of oil.

06/25/2015

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...