Drydocks World completes Beynouna overhaul for NDC

Offshore staff

DUBAI, UAE – Drydocks World has completed refurbishment of the offshore drilling rig Beynouna ahead of schedule for Abu Dhabi’s National Drilling Co. (NDC).

The shipyard performed a variety of tasks including drydocking, hull treatment, cleaning of seawater lines, crane repairs, high-pressure piping, and accommodation repairs.

It applied 40 tons of steel to 21 various tanks, with the pipe shop renewing all the rig’s sea water pipes in seven days.

Drydocks World’s rig division and NDC worked as an integrated team on the project.

04/13/2015

Beynouna
(Photo courtesy Drydocks World)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...