Aberdeen complex designed for high-pressure plug tests

Offshore staff

ABERDEEN, UKPeak Well Systems has completed work on its new gas pressure testing facility in Aberdeen for its well plug system.

The site will perform ISO14310 validation testing of Peak products up to the highest V0-Grade (zero gas leak). In addition, it is equipped to conduct tests at temperatures up to 200ºC (392ºF) and pressures of up to 15,000 psi (1,034 bar) for prolonged periods in simulated gas wells.

Its test bay can accommodate test fixtures up to 30 ft (9.1 m) long and 9⅝-in. diameter, and can be used to perform remote monitoring and measurement of digital test data using a 16-channel recording system.

Last year, Peak opened test facilities in Perth, Australia, where the company has undertaken testing of its SIMPLUS range of V3-Grade ISO14310 retrievable bridge plugs, subsequently verified and certified by Det Norske Veritas.

These plugs are designed for well barrier applications in monobore wells, creating according to the company, a reliable and high performance downhole seal at any point in the well.

04/14/2015

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...