WGMN completes Valemon platform hookup offshore Norway

Offshore staff

HOUSTONWood Group Mustang Norway (WGMN) has finished hookup operations for the Valemon platform in the Norwegian North Sea.

Statoil brought the Valemon field onstream around the turn of this year.

WGMN worked with South Korean fabricator Samsung Heavy Industries, providing detailed engineering support for the topsides, delivery of the flare boom, and hook-up/commissioning assistance.

This was the first platform delivered directly from a fabricator in Asia to installation offshore on the Norwegian continental shelf.

02/24/2015

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...