Technip installs ONGC process platform

Offshore staff

MUMBAITechnip has completed installation of the 8,200-metric ton (9,038 ton) HRD process platform for Oil and Natural Gas Corp. Ltd. (ONGC) with Technip’s Unideck system. It was the first time the system has been deployed in Indian waters.

The platform was installed in the Heera field redevelopment offshore India.

The integrated topsides float over installation system is designed for difficult sea conditions. It performs installation in a single operation by lowering the topsides through a system of jacks.

The HRD project started in 2013, when ONGC awarded Technip, in a consortium with AFCONS Infrastructure Ltd. and TH Heavy Engineering Berhad, the €220 million ($249 million) HRD process platform contract.

The topsides were designed by Technip in India for the floatover installation, with the support of Technip in France.

02/27/2015

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...