Jumbo installs MEG riser for PetroSA

Offshore staff

SCHIEDAM, the Netherlands – Jumbo has completed the subsea installation of a replacement MEG riser at the FA platform on the Ikhwezi project offshore South Africa for PetroSA.

Jumbo used its Fairplayer DP-2 heavy-lift crane vessel on the installation.

Jumbo’s scope of work included:

  • All installation engineering
  • Mobilization to South Africa
  • Load-out of 3-in. flexible MEG riser and protection/stabilization mattresses
  • Pre-survey and preparations at the FA platform
  • Installation (J-tube pull-in), protection and stabilization of the MEG riser
  • “As built” post installation survey.

02/27/2015

Jumbo’s Fairplayer installs new MEG riser offshore South Africa.
Jumbo’s Fairplayer installs new MEG riser offshore South Africa. (Photo courtesy Jumbo)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...