Cylinders to ease Snorre TLP tension reviews

Offshore staff

LISSENVELD, the Netherlands – Holmatro and its Norwegian dealer EIVA-SAFEX have supplied 64 cylinders, each with a capacity of 536 tons, to the Snorre A TLP in the Norwegian North Sea.

Additionally, they delivered controls and storage for the hydraulic system.

The TLP, 200 km (124 mi) from the Norwegian west coast, is anchored to the seabed with steel tethers. To measure and monitor pre-tensioning of the cables, each leg of the platform includes constructions equipped with load-cells.

During calibration of the load-cells the weight of the platform must be taken off. This task should be easier with the new cylinders, Holmatro claims.

According to Rob Loonen, sales engineer for Holmatro Industrial Equipment, “EIVA-SAFEX handled the lifting installation and we jointly drew up the required documentation in line with the legal requirements for the offshore platform.”

02/20/2015

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...