CNOOC produces first oil from shallow-water Bohai Jinzhou project

Offshore staff

HONG KONGCNOOC Ltd. has started production from its 100%-owned Jinzhou 9-3 comprehensive adjustment project offshore China.

The Jinzhou 9-3 oil field is in the North Liaodong Bay in Bohai in water depths ranging from 6.5-10.5 m (21.3-34.5 ft). Main production facilities are a central processing platform, a wellhead platform, and 21 producing wells.

Currently 15 wells are producing around 7,600 b/d of crude. The adjustment project is expected to reach peak production of around 12,000 b/d later this year.

CNOOC expects to bring onstream six more new projects this year. The list includes the Kenli 10-1 project and the Bozhong 28/34 comprehensive adjustment project in Bohai, where planned peak production is respectively 36,000 and 30,000 boe/d.

02/03/2015

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...