Ennsub completes Wheatstone installation

Offshore staff

ABERDEEN, UK – Ennsub has completed the design, manufacture, testing, and installation of bespoke sealing systems offshore Australia at the Wheatstone LNG platform.

Ennsub was contracted to design two different systems to provide an external and internal sealing system for ballasting pipes located at each corner of the platform.

The company also supplied all equipment, including downline recovery winches, remote disconnect heads, and isolation plugs. Following factory-acceptance testing simulating the offshore conditions, four Ennsub engineers went to Australia to perform the installation.

01/26/2015

Ennsub ballasting pipes seals at Wheatstone
Ennsub completes installation of ballasting pipes seals at Wheatstone. (Photo courtesy Ennsub)

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...