McDermott completes Banyu Urip installation offshore Indonesia

Offshore staff

HOUSTON – McDermott International Inc. has successfully concluded the transportation and installation of a yoke-type single point mooring tower and hook up to an FSO vessel for PT Rekayasa Industri at the Banyu Urip field offshore Indonesia. 

PT Rekayasa Industri was appointed by Mobil Cepu Ltd., an ExxonMobil subsidiary, as one of the engineering, procurement, construction, and installation contractors for the field. 

McDermott Derrick Barge 30 carried out the installation and hook up.

The Banyu Urip full field development is planned to produce 165,000 b/d from facilities that include 48 wells on three well pads, a central processing facility, and a 60-mi (97-km) pipeline to transfer the processed oil to a 1.7 MMbbl FSO unit in the Java Sea.

12/02/2014

Banyu Urip field offshore Indonesia

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...