Early production gets go-ahead for Búzios offshore Brazil

Offshore staff

RIO DE JANEIRO -- Petrobras has authorization to start up the early production system of well 2-ANP-1RJS on the presalt Santos basin Búzios field (formerly known as the Franco area).

The company expects to maintain operations for around seven months, providing information for optimizing the field’s first definitive production system.

Búzios is 200 km (124 mi) from the coast of Rio de Janeiro in a water depth of 1,600-2,100 m (5,249-6,890 ft). Petrobras submitted its declaration of commerciality for the field last December.

The company has already conducted 3D seismic studies over the field and drilled 11 wells to delimit and characterize the reservoir, which contains good-quality 26-28° API crude.

Búzios accounts for the bulk of the volume acquired by Petrobras via its transfer-of-rights agreement with the Brazilian government for the Santos basin presalt layer fields (3.058 Bboe out of a total of 5 Bbboe).

12/29/2014

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...