Trelleborg delivers flow assurance to Erha North offshore Nigeria for Subsea 7

Offshore staff

LANCASHIRE, UK Trelleborg’s offshore operation has secured a contract from Subsea 7 to supply its high-temperature thermal insulation material for Phase 2 of the Erha North project, Nigeria.

Trelleborg will supply several tons of high-temperature silicone insulation, Vikotherm S1, to the oil and gas flowlines in the field. Manufactured using room-temperature vulcanization technology, the coating can handle the Ehra field’s high 300°F (149°C) temperature, said Trelleborg.

The product was designed to cater to the harsh environment at the Ehra field and incorporates a unique silicone compound. The system can operate at ocean depths of 9,832 ft (3,000 m) and temperatures as high as 300°F (149°C).

The Erha North Phase 2 development sits at 3,960 ft (1,200 m) subsea and is an extension of the existing Erha subsea system and infrastructure, which is currently producing to the Erha FPSO located in Nigeria.

Trelleborg is expected to complete its supply of thermal insulation by 4Q 2014.

10/03/2014

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...