DeepOcean UK completes Chinese subsea piping project

Offshore staff

DARLINGTON, UKDeepOcean UK has completed work on a Chinese oil and gas project. The work was DeepOcean’s longest pipeline trenching order to date – at 174 km (108 mi) – when it was secured on behalf of China Offshore Oil Engineering Corp. (COOEC) in early 2012.

The work for COOEC saw DeepOcean carry out work on Liwan 3-1, which is part of the Liwan gas project, 300 km (186 mi) southeast of the Hong Kong Special Administrative Region.

DeepOcean used multi-purpose offshore vessel Volantis and UT-1, a free-flying jet trencher, to conduct trenching and survey operations on the Liwan Pipeline. A key component of the project, the pipeline connects the gas field’s central platform to the shore at China National Offshore Oil Corp.’s (CNOOC’s) Gaolan gas plant.

10/14/2014

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...