Phase 22 pipeline in place at South Pars field offshore Iran

Offshore staff

TEHRAN, Iran – Iranian Offshore Engineering and Construction Co. (IOEC) has completed 110 km (68 mi) of subsea pipelay operations at the South Pars gas field Phase 22 development in the Persian Gulf.

The new line connects the Phase 22 facilities with onshore installations.

According to new service Shana, phases 22 and 24 both feature two 32-in. and 4-in. diameter pipelines. Petro Sina Arya Co. is the main contractor for the developments with IOEC responsible for pipelay, using the C-Master vessel.

These two phases and Phase 23 are expected to collectively produce 56.6 MMcm/d (2 bcf/d) of gas.

09/15/2014

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...