Phase 22 pipeline in place at South Pars field offshore Iran

Offshore staff

TEHRAN, Iran – Iranian Offshore Engineering and Construction Co. (IOEC) has completed 110 km (68 mi) of subsea pipelay operations at the South Pars gas field Phase 22 development in the Persian Gulf.

The new line connects the Phase 22 facilities with onshore installations.

According to new service Shana, phases 22 and 24 both feature two 32-in. and 4-in. diameter pipelines. Petro Sina Arya Co. is the main contractor for the developments with IOEC responsible for pipelay, using the C-Master vessel.

These two phases and Phase 23 are expected to collectively produce 56.6 MMcm/d (2 bcf/d) of gas.

09/15/2014

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...