Hyundai completes BP’s PSV backlog

Offshore staff

ULSAN, South Korea – Hyundai Mipo Dockyard (HMD) has delivered its fourth platform supply vessel (PSV) to BP Shipping.

The previous three were delivered between January and July of this year, following the contract award in March 2012.

NS Frayja, the latest delivery, is 97 m (318 ft) long and 20 m (65.6 ft) wide, with a depth of 8.5 m (27.9 ft). Features include oil recovery operation and a dynamic positioning system.

The vessel is sailing to the North Sea.

09/23/2014

NS Frayja

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...