South Pars topsides ready for installation offshore Iran

Offshore staff

TEHRAN, Iran – One of the topsides has been completed for the new South Pars Phase 12 platforms in the Persian Gulf, according to news service Shana.

Iran’s Offshore Engineering and Construction Company designed and built the 3,250-ton structure topside at Khorramshahr Yard in southwestern Iran.

When platforms A, B, and C of Phase 12 of South Pars become operational, Iran’s gas output should rise by 62.5 MMcm (2.2 tcf), Shana adds.

6/6/2014

Soth Pars topsides
Soth Pars topsides ready to install. Shana photo

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...