Orga completes installation of helideck lighting for Ensco

Offshore staff

SCHIEDAM, the Netherlands Orga Offshore has installed its CAP 437-compliant Circle - H LED touchdown, positioning, and heliport identification marking system on the ENSCO 70 and ENSCO 80 jackups.

The latter marks the fifth installation for Orga in as many weeks, and the company has orders to deliver and install 550 certified Circle-H helideck lighting systems over the next three years.

Developed in collaboration with the UK Civil Aviation Authority (UK CAA) to improve visibility for approaching pilots in all weather conditions, Orga’s ATEX and IECEx (Zones 1 and 2) certified touchdown/positioning and marking (TD/PM) Circle - H helideck lighting system was installed by Wellhead Electrical Supplies while both drilling rigs were undergoing upgrade and maintenance work at Able Seaton Port.

05/12/2014

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...