Artificial Lift deploys Advantage rigless ESP system for Total E&P Congo

Offshore staff

HOUSTON – Artificial Lift Co. (ALC) has deployed its Advantage electrical submersible pump (ESP) system for Total E&P Congo in the Republic of Congo.

The rigless system was installed, conveyed, and retrieved on a System Integration Test water well near the Djeno terminal. Total will now include the Advantage system in future wells offshore. All of Total E&P Congo’s production comes from offshore, and the majority requires secondary lift.

A downside of using an ESP is the need for frequent intervention and the limitation of having workover vessels available offshore. The Advantage slickline-conveyed, rigless ESP system reduces intervention time, intervention cost, and production downtime because of the lack of rig availability and mobilization – thus, the system reduces OPEX, increases well up-time, reduces production deferment, and can be a step-change in the way new fields are developed.

05/23/2014

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...