Petrobras starts up P-55 in Campos basin’s Roncador field

Offshore staff

RIO DE JANEIROPetrobras has started up platform P-55 in Campos basin’s Roncador field. P-55 is part of the field’s Module 3 project and will be connected to 17 wells, 11 of which are oil and gas production and six are water injection.

P-55, a semisubmersible unit, was installed at a water depth of 1,800 m (5,906 ft), and is designed to process 180,000 b/d of oil, compress 6 MMcm/d (212 MMcf/d) of natural gas per day, and inject 290,000 bbl of water per day. Weighing 52,000 tons, and with an area of 10,000 sq m (107,639 sq ft), P-55 is the biggest semisubmersible platform ever built in Brazil and one of the biggest of its kind worldwide.

The new unit will operate along with platforms P-52 and P-54, which are already installed in Roncador field, and with platform P-62, which left the Atlântico Sul Shipyard in Ipojuca (Pernambuco state) on Dec. 30, 2013, and is moving toward its Module 4 location in the field. 

01/02/2014

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...