EPCIC contract awarded for Nong Yao oil development

Offshore staff

SINGAPORE – KrisEnergy Ltd. reports that operator Mubadala Petroleum has awarded the contract for engineering, procurement, construction, installation, and commissioning of the production and processing facilities at the Nong Yao oil development in block G11/48 in the Gulf of Thailand to Nippon Steel and Sumikin Engineering Co. Ltd. (NSSE).

The development concept for the initial phase of the Nong Yao field comprises 23 wells, a wellhead processing platform, and a minimum facility wellhead platform with the export of crude oil via a FSO vessel. The production capacity will be up to 15,000 b/d of oil and 30,000 b/d of fluid. First oil is anticipated in 1H 2015.

KrisEnergy holds a 25% working interest in G11/48, and Mubadala Petroleum has the remaining 75%. G11/48 covers 6,791 sq km (2,622 sq mi) over the southern margin of the Pattani basin and the northwest margin of the Malay basin in water depths of up to 75 m (246 ft).

01/15/2014

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...