2D seismic survey off Papua New Guinea ending

Offshore staff

LONDON – The Dong Fang Kan Tan No. 1 should have completed a 3,000 line km (1,864 mi) 2D seismic survey offshore Papua New Guinea at this time. The work was 98% complete in the middle of this past week.

CNOOC (NYSE:CEO) is the operator and BGP PNG Exploration is conducting the survey on PPL374 and PPL375, held 100% by Gini Energy Ltd. CNOOC holds 70% of Gini and UMC Energy (AIM:UEP.L) holds 30%.

1/6/14

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...