BMT Nigel Gee to design two crew vessels

Offshore staff

SOUTHAMPTON, UK – BMT Nigel Gee has won a design contract with Penguin Shipyard International for the design of two 25-m (82-ft) monohull Fast Crew Boats.

Penguin is building the two BV classed, 70-passenger Fast Crew Boats for ARCO Marine and Oilfield Services for deployment offshore Nigeria. Delivery of the vessels is expected in the 4Q 2013.

Each vessel has a four-engine (MAN D2842LE405), four-waterjet (Rolls Royce A40A3) configuration, accommodation for four crew members with an endurance of four days, a range of over 600 nautical miles and a maximum speed in excess of 30 knots.  Above the deck, the design incorporates a wheelhouse that has good all-round visibility for safety and a fire monitor on the upper deck superstructure. Each vessel can also carry up to 4 metric tons (4.4 tons) of deck cargo.

1/18/2013

BMT crew boat design

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...