Wood Group Mustang Canada to work on WREP topsides facility

Offshore staff

ST. JOHN'S, CanadaWood Group Mustang Canada has won the detailed engineering and design of an integrated topsides facility as part of the White Rose Extension Project (WREP), offshore Newfoundland and Labrador, Canada.

Subject to partner, company and regulatory approvals, the WREP facility will consist of topsides supported by a concrete gravity structure (CGS). Wood Group PSN will provide support with the engineering, procurement, and regulatory services.

Detailed engineering design of the topsides is scheduled to be completed by 1Q 2015. Wood Group Mustang Canada and Wood Group PSN delivered the front-end engineering design (FEED) for the topsides earlier this year.

12/20/2013

 

 

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...