MODEC lands management role in Stampede TLP

Offshore staff

TOKYOMODEC International has reached a pre-sanction agreement with Hess Corporation to provide engineering and management services for the Stampede tension leg platform (TLP).

Work scope includes project management, engineering, procurement management, and construction management for the hull and mooring system of a conventional TLP, MODEC said. Continuing services are contingent upon the project’s sanction, which Hess has said will likely come in 2014.

The deepwater Gulf of Mexico project is a joint development of the Pony discovery, in Green Canyon block 468, and Knotty Head, in Green Canyon block 512. The TLP will be installed in water depths of approximately 3,550 ft (1,082 m).

Hess operates the development with 20% interest; Unocal (Chevron), BHP Billiton, Statoil, and Nexen each hold 20% working interest.

07/17/2013

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...