Oleg Strashnov to install Gullfaks subsea compression structures

Offshore staff

ZOETERMEER, the Netherlands – Subsea 7 has contracted Seaway Heavy Lifting to deliver a wet gas compression station to the Gullfaks complex in the Norwegian North Sea.

The crane vessel Oleg Strashnov will transport and install the 500-ton module and 300-ton protection structure for Statoil’s Gullfaks subsea compression project, 15 km (9.3 mi) south of the Gullfaks C platform.

Work will be performed in spring 2015 in a water depth of 140 m (459 ft), with the vessel in DP mode during the installation.

6/21/2013

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...