Nexans to fasttrack umbilical for Shell offshore Malaysia

Offshore staff

PARIS – Persada Engineering has contracted Nexans to supply an electro/hydraulic umbilical for Sarawak Shell Berhad’s F29 field development.

The 22-km (13.7-mi) long umbilical will go into water depths of approximately 100 m (328 ft). Nexans is responsible for the supply and transportation of the umbilical on a fasttrack turnaround of 72 weeks.  

The umbilical will be manufactured at Nexans’ Halden, Norway, facility.

4/18/13

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...