Aker to supply umbilicals for Girassol extension offshore Angola

Offshore staff

PARIS – Technip has contracted Aker Solutions to provide umbilicals and ancillary equipment for Total’s Girassol Resources Initiative (GirRI) Phase 2 development offshore Angola.

Aker will supply two dynamic power and control steel tube umbilicals and one dynamic power cable. These will be manufactured at the company’s plant in Moss, Norway, with project management, design and engineering support from Aker’s Fornebu offices.

GirRI is in block 17, 210 km (130 mi) west of Luanda in 1,300 m (4,265 ft) of water.

4/16/2013

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...