LOGGS problems halt operations at North Sea field

Offshore staff

OSLO, Norway – Bridge Energy says the UK North Sea gas export infrastructure system used by the company’s Victoria field has been unavailable since Nov. 30.

This unavailability is due to issues affecting the ConocoPhillips-operated Lincolnshire Offshore Gas Gathering System (LOGGS) facilities. As a result production from the Victoria field is shut in.

Output will resume as soon as the export system availability is restored.

12/20/2012

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...