Statoil orders new FSU for Heidrun field in the North Sea

Offshore staff

STAVANGER, Norway – Statoil (OSE:STL; NYSE:STO) has issued a letter of intent to Samsung Heavy Industries to build a new permanent floating storage unit for Heidrun field in the Norwegian North Sea. The FSU will replace an existing buoy loading system.

The $230-million contract includes options for two additional units. Samsung will carry out engineering, procurement, and construction services and has applied its own vessel design to meet Statoil's requirements.

The new FSU will permanently connect to a buoy, and oil will be lifted from the FSU by shuttle tankers. The FSU will be permanently manned and has an expected design life of 30 years.
The unit will be built by Samsung at Geoje Island, Republic of Korea. Engineering starts immediately and the unit is expected on location at Heidrun in the first half of 2015.

9/13/2012

 

Heidrun field platform
Platform at Heidrun field in Norwegian North Sea. Photo by Øyvind Hagen.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...