Bowleven resumes drilling offshore Cameroon

Offshore staff

EDINBURGH, UK – The jackup Atwood Aurora has spudded the IM-5 appraisal/development well on the MLHP-7 block in the Etinde permit offshore Cameroon.

Operator Bowleven’s main aim is to determine the reservoir and fluid properties of the Middle Isongo sands. A secondary goal is to explore the potential of the Intra Isongo reservoir sands.

The Upper Isongo reservoir sands, proven to be gas-bearing by the previous four IM wells, are prognosed to lie beneath the gas/water contact and are therefore water-bearing at this location.

The current well is being drilled about 1 km (0.6 mi) south of the IM-3 well location, in a water depth of 56 m (184 ft), with a TD of 3,475 m (11,401 ft). It has been designed to allow suspension as a future production well.

Drilling will involve an extensive logging, testing, and coring program. The rig has been contracted for a second well, with the location and timing pending results from ongoing technical work and the outcome of the current well.

9/25/2012

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...