Philippines extends permit to allow time for ultra deepwater drill rig charter

Offshore staff

SYDNEY, Australia – The Philippines Department of Energy has extended for one year an existing permit for exploration Sub-Phase 4 in SC55.

Operator BHP Billiton (NYSE:BBL) requested the extension in order to secure an appropriate ultra deepwater rig with specialized well control equipment it wants for safe drilling on the proposed Cinco prospect within SC55.

After the extension, Sub-Phase 4 and one committed well will be drilled by Aug. 5, 2013. Sub-Phase 5 calls for another well then to be drilled by Aug. 5, 2014.

The working interests in Service Contract 55 are Otto Energy (ASX: OEL) through wholly owned subsidiary NorAsian Energy Ltd, 33.18%; BHP Billiton Petroleum (Philippines) Corp., 60%; and Trans-Asia Oil and Energy Development Corp., 6.82%.

5/24/2012

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...