Petrobras orders Oceaneering-record umbilicals for Lula, Sapinhoá

Offshore staff

HOUSTON – Petrobras has contracted Oceaneering International to supply 200 km (125 mi) of thermoplastic production control umbilicals for projects in the Santos basin offshore Brazil.

The contract is worth more than $120 million, and is Oceaneering’s largest-ever umbilical order. The umbilicals are for the presalt Lula and Sapinhoá field developments.

Manufacturing should be performed at Oceaneering’s plant in Niteroi, Brazil, starting in 3Q 2012, and continuing through 3Q 2015.

5/9/2012

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...