Pemex signs McDermott for offshore GoM drilling platform

Offshore staff

HOUSTON – PEMEX Exploracion y Produccion has contracted McDermott International Inc. for the new Ayatsil-B drilling platform in the Bay of Campeche, Gulf of Mexico.

McDermott is contracted for the engineering, procurement, fabrication, pre-commissioning, load-out, and sea fastening of the Ayatsil-B eight-leg jacket and deck, weighing approximately 11,650 metric tons (12,842 tons) for installation in waters 115 m (377 ft) deep. McDermott also will carry out transportation and installation analysis of the structures, and will conduct training for Pemex personnel for the facility operation and maintenance.

Completion is expected during 3Q 2013.

5/23/2012

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...