GDI orders third newbuild jackup drilling rig

Offshore staff

SINGAPORE – Gulf Drilling Inc. of Qatar has ordered from PPL Shipyard Pte Ltd a newbuild Pacific Class 400 jackup drilling rig for delivery next March.

The rig will accommodate 150 personnel and drill to 30,000 ft (9,144 m) in 400 ft (122 m) of water at a cost of $250 million.

This is GDI’s third newbuild jackup order within the past year.

“We are most familiar with the PPL rig designs and consider them to be very suitable for the requirements of our clients here in Qatar,” said GDI CEO Ibrahim J. Al-Othman.

4/09/2012

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...