Red Spider lines up subsea intervention assignments

Offshore staff

ABERDEEN, UK – Red Spider has won a $2.35-million order to provide new products for well completion operations. The company will supply its eRED-FB systems for deployment this summer in the UK North Sea. The equipment will be used for a series of subsea dual ESP wells.

eRED, Red Spider’s tool for remotely operating downhole valves, has been used by more than 20 operators. The company claims the technology cuts risk and helps maximize production time by removing wireline runs from operations.

It can save operators more than £300,000 ($468,000) during a single subsea completion operation, the company adds, typically reducing slickline runs from eight to one. In deepwater workover operations, savings of up to 36 hours and £500,000 ($780,000) have also been recorded in a single job.

eRED-FB valves provide a downhole barrier that can be opened and closed by remote command, allowing the tubing integrity to be tested without the need for conventional plug and prong equipment. This eliminates the necessity to deploy traditional wireline methods.

3/12/2012

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...