Preparations under way for North Sea Camelot platform decommissioning

Offshore staff

FALMOUTH, UK – Coastline Surveys has completed a pre-decommissioning environmental survey for Energy Resource Technology (UK), a division of HELIX.

The program was in preparation for decommissioning of the Camelot CA production platform and associated subsea infrastructure in block 53/1a in the UK southern North Sea.

The M/V Flatholm performed a geophysical survey, using high resolution Reson 8125 Multi-beam and Edgetech sidescan sonar equipment, followed by grab sampling, video and stills camera work at predetermined sites, and drill cuttings pile assessment under the OSPAR Recommendation 2006/5.

In addition, Coastline undertook a multi-beam/ROV debris survey, prior to arrival of the Seafox7 jackup platform.

3/28/2012



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...