Hamworthy wins further process order for BP FPSO

Offshore staff

POOLE, UK – Hyundai Heavy Industries has contracted Hamworthy to supply an ST8 series treatment plant for BP’s new Quad 204 FPSO.

BP’s vessel will be deployed west of the Shetland Isles in the UK North Atlantic as a replacement for the Schiehallion field FPSO.                  

The ST8, which handles around 12,000 liters/day (3,179 gal/day), has been modified to meet stricter sewage treatment operating standards under IMO MEPC 159(55) guidelines. These include more stringent rules concerning black water effluent quality treatment.               

The pumps and macerators are made from 316 stainless steel and pipe work in super duplex stainless steel, according to NORSOK M-650 stipulations.

“The design uses Emerson instrumentation and programmable logic control where quality control, material, welding, and non-destructive examination standards were all in line with BP’s project requirements,” said Gary Mills, project manager, Hamworthy Water Systems.

Hamworthy is also supplying inert gas generator packages for the same project. All equipment is due to be delivered later this year.

3/13/2012

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...