March start for Caspian jackup transportation

Offshore staff

ESBJERG, Denmark – Blue Water Shipping has won a contract to transport a newbuild jackup to the Caspian Sea for Eurasia Drilling.

The Le Tourneau S116(E) design jackup is under construction by Lamprell at the Hamriyah facility in Sharjah (UAE).

Blue Water will transport 85,000 cu m (3 million cf) of cargo with a total weight of 8,205 metric tons (9,044 tons), of which the heaviest component will weigh 1,050 metric tons (1,157 tons). Due to the limited breadth and draught of the river system locks, these facilities must be separated into smaller sections for reassembly on arrival at the Caspian.

Individual units will be transported on heavy-lift vessels from Dubai to the Black Sea for subsequent transfer to river barges and the onward voyage through the river system to the Caspian Sea. Transportation will be performed in three shipments, starting in March, and is due to be completed within four months.

2/2/2012

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...