Offshore Europe 2011: Tentec to debut new bolt tensioning tool

Offshore staff

ABERDEEN, UK – Tentec plans to debut its new Optimus 7 bolt tensioning tool that can be used both subsea and topside. The presentation also is to feature the Bolt Tightening Software package that walks the operator through the complete sequence.

Tentec says the Optimus 7 works on ANSI B16.5, ANSI B16.47, API 6A, API 17D, and MSS-SP44 pipe flanges plus the Vector SPO Compact Flanges.

The software gives the correct, best practice tightening sequences along with the tensioner pressures required to tighten a bolted joint in the most efficient time possible.

Other new Tentec products to be featured at the show include the Optimus Flange Pulling System, hydraulic torque wrenches, and a specially designed Blind Flange Cap as used on a specialized water injection system project in the North Sea.

Click to Enlarge
Tentec features the Optimus 7 bolt tensioning tool at Offshore Europe 2011.

08/29/2011



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...