Canyon orders second LARS from IHC

Offshore staff

NEWCASTLE-UPON-TYNE, UK – Canyon Offshore has contracted IHC Engineering Business to supply a 35-metric ton (38.5-ton) Launch and Recovery System (LARS). The A-frame system will be used to launch and recover a newly built trenching ROV.

This will be IHC EB’s second LARS for Canyon, having previously supplied a 95-metric ton (104.7-ton) SWL system for the i-Trencher, built in 2008.

The new LARS will be able to launch and recover the trenching ROV in up to Sea State 5. It will be designed over the next few months, prior to assembly and testing at IHC EB’s Port of Tyne support base in northeast England for delivery in 2012.

05/24/2011



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...