Chevron contracts for Jack/St. Malo produced water treatment

Offshore staff

ATLANTA, Georgia – MyCelx has contracted to supply Chevron USA with a produced water treatment system for Jack/St. Malo to remove oil and water soluble organics to less than 10 ppm. The design requirements for the Jack/St. Malo floating production facility calls for an overboard discharge limit lower than the current EPA limit of 29 ppm,

The system will be designed to treat 70,000 b/d of water.

04/25/2011



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...