Genex Power moves forward on US$282 million pumped-storage hydroelectric project

Kidston pumped-storage project site

New South Wales-based Genex Power Ltd. has successfully acquired the closed Kidston Gold Mine in northern Queensland, Australia, where the company plans to construct the US$282 million, 330-MW Kidston pumped-storage hydroelectric project.

The company plans to commission the project in 2018.

The Kidston pumped-storage project will utilize the mining operation’s existing infrastructure that includes two large mining pits, access and service roads, a power distribution network and a water pipeline to the Copperfield Dam.

Copperfield Dam, part of the mine that was closed in 2001, is a roller-compacted-concrete dam that has a smooth spillway surface. It has been in service since the 1980s and continues to occasionally discharge water at high velocity as a result of occasional major floods.

Similar to other hydroelectric power plants, the facility will offer rapid response grid “blackstart” capabilities, helping to restart other generators and the electricity grid within seconds in the event of network shutdown.

The Kidston scheme is located 1,320 km north of Brisbane and covers an area of about 1,237 hectares and will be the third largest hydroelectric energy storage project in Australia, according to the company.

Genex is at an advanced stage of a dual feasibility process to develop the pumped-storage hydroelectric scheme and an adjacent 150 MW large-scale solar PV energy generation scheme.

Genex’s Managing Director, Michael Addison, said, “This is an important step for Genex, giving us the advantage of being able to match the long-term nature of the infrastructure assets that we are developing with the tenure of our site land holding. We see this as one of the key elements in being able to secure the necessary project finance required to bring our projects into production.”
 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs