Manitoba Hydro seeks excitation transformers for 1,340-MW Limestone, 250-MW Kelsey hydro projects

Kelsey Hydropower Project

Canadian utility Manitoba Hydro seeks bids to supply excitation transformers for the 1,340-MW Limestone and 250-MW Kelsey hydroelectric projects on the Nelson River in Manitoba. Bids are due May 22.

The Limestone project was built on the Nelson in the 1990s downstream from the site of the proposed 695-MW Keeyask project. Kelsey has been undergoing major rehabilitation that began in 2006. In other action, Manitoba Hydro is seeking bids in July to equip the 78-MW Pointe du Bois hydroelectric project on the Winnipeg River.

The utility now seeks design, manufacture, delivery and warranty of two indoor, three-phase, 60 Hz, self-cooled, dry-type excitation transformers to be utilized as synchronous generator excitation transformers at Limestone (a 3,200-KVa unit) and Kelsey (an 855-kVA unit). The units will be on rectifier duty and shall be adequately sized to account for harmonic losses.

A solicitation notice may be obtained from the Canadian Public Tenders Internet site under http://www.merx.com/English/SUPPLIER_Menu.asp?WCE=Show&TAB=3&PORTAL=MERX&State=7&id=PR327890&src=osr&FED_ONLY=0&ACTION=NEXT&rowcount=2000&lastpage=200&MoreResults=&PUBSORT=2&CLOSESORT=0&IS_SME=N&hcode=ktxfIBuqtubeD%2f%2blBcgD7g%3d%3d.

Bids are due by 4 p.m., Central time, May 22. For information, contact Manitoba Hydro, Purchasing Dept., P.O. Box 1287 STN MAIN, Winnipeg, MB R3C 2Z1 Canada; Fax: (1) 204-360-6130; E-mail: purchasing@hydro.mb.ca; Internet: www.hydro.mb.ca.
 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs