Nepal Electricity Authority (NEA) seeks bids to supply a trashrack cleaning machine as part of rehabilitation of the 144-MW Kali Gandaki A hydroelectric project on the Kali Gandaki River in western Nepal. Bids are due January 23, 2015.

NEA previously called for bids in April for a trashrack cleaning machine, as well as turbine parts and a powerhouse auxiliary system for Kali Gandaki A, also called Kaligandaki A. It also took bids in December for powerhouse auxiliary system parts. It recruited consultants in 2013 to design and supervise the project's rehabilitation.

NEA now seeks bids for Contract KGAHPPRP/G/ICB-4-R, supply, delivery and installation of a trash rack cleaning machine.

Bid documents may be obtained from the address below for 20,000 rupees or US$210. Payment is to be deposited in the NEA, Generation Account No. 1206101-001-012-524 at Nepal Rastra Bank, Thapathali, Kathmandu, or in the form of a bank draft drawn in favor of "Kaligandaki A Hydropower Plant Rehabilitation Project (KGAHPPRP)." Foreign bidders requesting delivery of documents by courier should submit an additional fee of US$300 in the form of an additional bank draft.

Bidding documents also are available on the NEA Internet site, www.nea.org.np. Bids are due by noon January 23 to the address below.

For information, contact Nepal Electricity Authority, Project Coordinator, Kali Gandaki A Hydropower Plant Rehabilitation Project (KGAHPPRP), Generation Directorate, Durbarmarg, Kathmandu, Nepal; (977) 1-4153070; Fax: (977) 1-4153071; E-mail: kgahpprp@nea.org.np; Internet: www.nea.org.np.
 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs