Canada utility seeks shore stations for two hydro projects

Manitoba Map

Canadian utility Manitoba Hydro seeks bids to construct two shore stations interconnecting two hydroelectric projects in Manitoba. Bids are due April 23.

The utility awarded a contract in March to BBE Hydro Constructors Limited Partnership to build the 695-MW Keeyask hydroelectric plant on the Lower Nelson River. Manitoba Hydro, which completed the 200-MW Wuskwatim hydro project on the Burntwood River in 2012, recently signed a memorandum to investigate sale of up to 600 MW of hydropower to U.S. cooperative Great River Energy.

Manitoba Hydro said it now seeks installation of shore stations intended to interconnect 600-volt main output power, 600-volt auxiliary supply power and low-voltage control and communications cables from a 600-VAC, 800-kW/1,000-kVa rated semi-mobile diesel generator to the station service power system of two hydroelectric stations. Each shore station is to be installed adjacent to a 300-kVa resistive load bank, supplied and installed by others, for testing purposes.

The solicitation may be obtained from the Canadian Public Tenders Internet site under http://www.merx.com/English/SUPPLIER_Menu.asp?WCE=Show&TAB=3&PORTAL=MERX&State=7&id=PR293474&src=osr&FED_ONLY=0&ACTION=PAGE1&rowcount=23&lastpage=3&MoreResults=&PUBSORT=2&CLOSESORT=0&IS_SME=N&hcode=UtmDrU9JXDfaucMSHTxGYw%3d%3d.

Bids are due by 4 p.m., Central time, April 23. For information, contact Manitoba Hydro, Purchasing Dept., P.O. Box 1287 STN MAIN, Winnipeg, MB R3C 2Z1 Canada; Fax: (1) 204-360-6130; E-mail: purchasing@hydro.mb.ca; Internet: www.hydro.mb.ca.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs