Interior provides funding for Montana's Yellowtail Afterbay hydropower project

Yellowtail Afterbay Dam

A US$655,000 grant from the U.S. Department of the Interior will help the Crow Tribe complete work on an 8 MW hydropower project at the Yellowtail Afterbay Dam.

The funding, announced by U.S. Secretary of the Interior Sally Jewell during a recent visit to Montana, will allow for environmental evaluations, permitting, engineering and design work.

The hydroelectric plant is intended to help the Crow Tribe diversify its revenue. Currently, the group is largely dependent on coal mining.

Other funding for the project was secured through the Crow Water Rights Settlement signed by President Barack Obama in December 2010.

Yellowtail Afterbay Dam is located on the Bighorn River about two miles downstreanm from Yellowtail Dam. The dam is a 72-foot-high concrete gravity structure with embankment wings.

For more new development news, visit here.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs